Increasing Quality and Reliability Work of Railway Port Station

Albert P. Shirokov

Abstract


Key word: gravity hump, gravity hump automatic switching, gravity hump technological interval, port railway station, "railway station - port" system, MSR-32

 

Annotation: this article proposes an option to improve the work of the port railway station-to-station Nakhodka example, by introducing a system of gravity hump automatic switching.


Volltext:

PDF (Russian)

Literaturhinweise


Eremenko EA. Ways of enhancement of technology of work of the station a find of the Far East railroad with local cars: EA. Eremenko, AP. Shirokov: Scientific and technical and economic cooperation of Asia-Pacific countries in the 21st century: coll. works All-Russian scientific and practical conference of students, graduate students and young scientists, T. 1, No. 1. Khabarovsk, 2015; 133-140.

The strategy of development of Russian Federation rail transport until 2030. Moscow, 2007.

Smekhova, NG. Prime cost of rail haulings: studies. for higher education institutions. - of transport: under the editorship of NG Smekhova and AI. Kuporov. Moscow, 2003; 494.

Regulations of time for the shunting works performed on railway stations of JSC "Russian Railways", standard rates of number of crews of pilot engines. Moscow, 2007; 98.


Refbacks

  • Im Moment gibt es keine Refbacks